Skip to content
Dervoss

Surveying & Site Measurement  —  01

Setting out & verification surveys in Dubai & the UAE

A setting out survey marks the approved design onto the site (gridlines, levels, corners and key positions) so the contractor builds in the right place. A verification survey later measures what was built and checks it against the design.

Dervoss provides setting out survey across Dubai, the UAE and Saudi Arabia, captured and produced by one in-house team.

On site
Within 24 hours of a confirmed LPO
Repeat visits
Scheduled around your construction programme
Quote
Fixed price, same-day reply

Real Dervoss work

Dervoss on site

Dervoss on site

02  —  What you receive

What Dervoss delivers for setting out survey

4 deliverables

Illustration: Project control and benchmarks

01 · Illustration

Project control and benchmarks

A documented network of control points and benchmarks on your project's coordinate system and datum, reused for every later survey.

Marked points on site: real Dervoss deliverable example

02 · Real Dervoss deliverable

Marked points on site

Gridlines, corners, pile positions, levels and offsets marked on the ground or the structure from your approved drawings.

Illustration: Setting out record

03 · Illustration

Setting out record

Every point set out, with its design coordinates and level, so the site team and the consultant can see exactly what was marked and where.

Illustration: Verification survey report

04 · Illustration

Verification survey report

Built work measured and compared with the design, offsets listed and anything outside tolerance flagged.

Formats

PDF record / reportDWGCoordinate list (CSV)

03  —  When you need it

When do you need a setting out survey?

  1. 01

    Before excavation, piling or foundations

    Building corners, pile positions and levels marked from the project control.

  2. 02

    Every new floor of a structure

    Gridlines, column positions and levels transferred up as the building rises.

  3. 03

    MEP, openings and fit-out

    Sleeves, openings, partition lines and equipment positions marked from the drawings.

  4. 04

    External works and roads

    Kerbs, road levels, drainage falls and limits of works laid out on the ground.

  5. 05

    Checking work that's already built

    A verification survey measures what was built against what was designed.

04  —  How it works

How does setting out work on site?

  1. Step 01

    Check the drawings and coordinates

    We review the approved drawings and coordinate data before anyone goes to site, and raise anything that doesn't close.

  2. Step 02

    Establish or check the control

    Control points and benchmarks are set up or verified on the project coordinate system with GNSS and total station.

  3. Step 03

    Mark the points

    Gridlines, corners, levels and positions are set out on site and checked against independent control.

  4. Step 04

    Record and hand over

    You receive the setting out record in the same format every visit, ready for the consultant's file.

05  —  In detail

06  —  Why Dervoss for setting out survey

One control network, from first survey to final check.

The topographic survey, the setting out, the laser scans and the final verification all sit on the same project control. Measurements taken months apart agree with each other, so a question about a level is settled by data, not by argument.

  • 01

    We capture and we draw: one team

    No hand-off between a scanning company and an offshore drawing shop: the team that measured your site produces your deliverables.

  • 02

    Survey-grade accuracy

    Trimble X9 laser scanning and survey-grade instruments, accurate to ±2 mm, with an accuracy statement per delivery.

  • 03

    UAE, KSA & GCC coverage

    All seven emirates, Saudi Arabia and the wider GCC, with deliverables prepared for local authority requirements.

  • 04

    Fast mobilisation

    On site within 24 hours of a confirmed LPO; urgent concrete and utility scans often same-day.

07  —  Questions

Setting Out Survey: questions clients ask Dervoss

What is a setting out survey?

What's the difference between setting out and a verification survey?

Can you set out directly from our CAD drawings or BIM model?

Do you mark legal plot boundaries (demarcation)?

When does a project need setting out?

What do I receive?

How quickly can you mobilise?

How much does a setting out survey cost?

08 — Get a fixed quote

Send the site details. The quote comes back the same day.

Describe the job in your own words; you don't need to know the right survey name. A fixed price and a committed delivery date, no obligation. Plans or photos? Send them on WhatsApp.

On site

Within 24 h of a confirmed LPO

Office

Al Barsha South 3, Dubai

Hours

Mon-Fri 10:00-18:00

Quote request

Tell us about the site

Same-day reply in working hours. Fixed quote, no obligation.

We only use your details to respond to your enquiry.